Do you have any question about this error?
Message type: E = Error
Message class: C2 - Other messages production orders
Message number: 234
Message text: Änderung des PSP-Elements. Komponenten werden angepasst.
You want to assign the new WBS element &V1& in order &V2&.
Because the WBS element changes, all components from this order that
are assigned to a WBS element are also assigned to the new WBS element
&V1&. If this is not possible, the WBS element cannot be changed for
the order header.
For order networks, the cross-project change to the WBS element is
possible only in the header of the leading order. Here, all dependent
orders and all components in the network are adjusted.
Ensure that the settlement rule is also adjusted correctly.
The message type for this message can be set using transaction OPJB.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
C2234
- Änderung des PSP-Elements. Komponenten werden angepasst. ?Get instant SAP help. Start your 7-day free trial now.
C2233
Die Konfiguration ist inkonsistent: Anzeige nicht möglich.
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
C2232
Zu Material &1 konnte keine gültige Stückliste gefunden werden
Was verursacht dieses Problem? Material &V1& is marked as a phantom assembly. When the system tried to explode a valid bill of material for...
C2235
Zu Auftrag &1 bestehen noch Änderungsvormerkungen
Was verursacht dieses Problem? In order change management, production order <(>&<)>V1& has procurement element change records t...
C2236
Zum führenden Auftrag &1 existiert eine Änderungsvormerkung
Was verursacht dieses Problem? Production order <(>&<)>V2& is part of a collective order which has the leading order <(>&...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.