How To Fix APO_BAPI156 - Für SNP/DP Pläne muss das Feld CP_DATE_TO übergeben werden.


APO_BAPI156 - Overview

  • Message type: E = Error

  • Message class: APO_BAPI - Message Class for APO BAPIs

  • Message number: 156

  • Message text: Für SNP/DP Pläne muss das Feld CP_DATE_TO übergeben werden.

  • Show details Hide details
  • Was verursacht dieses Problem?

    You have not filled the field "CP_DATE_TO" and wish to create or alter
    an SNP or DP plan. For SNP or DP plans one logical component with the
    name of the product must be transmitted for each product component
    assignment. In addition, the field "CP_DATE_TO" on the logical
    component level must be filled with the data of the field "DATE_TO" on
    the product component assignment level.
    This is also valid for the time-dependent paramaters of the product
    component assignment.
    For PP/DS plans the field "CP_DATE_TO" is of no importance.

    Systemantwort

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    Wie behebe ich diesen Fehler?

    Please enter in field "CP_DATE_TO" the "DATE_TO" date of the
    "COMP_PRODUCT" entry to which the entry refers.

    Vorgehensweise für Systemadministratoren


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler APO_BAPI156 - Für SNP/DP Pläne muss das Feld CP_DATE_TO übergeben werden. ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker