Message number: 197
Message text: Übergeordnetes PSP-Element hat bereits eigenes Budget
WBS element &V1& is assigned to an investment program position, or is
to be assigned to an investment program position.
The following settings have been made for this program position:
All WBS elements that are subordinate to this position should receive
their budget solely from budget distribution from this program
position.
All WBS elements that are above WBS element &V1& in the hierarchy, as
well as those that are above the WBS elements that are subordinate to
WBS element &V1& (in other words, these superior WBS elements are in a
"path" above WBS element &V1&), should also be budgeted automatically,
meaning they can only receive budgets equaling the amount entered for
the budget distribution. These superior WBS elements should only be
budgeted automatically in this way, that is, they are not allowed to
have their own, distributable budget.
However, at least one WBS element, which is above WBS element &V1&,
already has its own, distributable budget.
First reduce the existing distributable budget of the WBS element(s)
above WBS element &V1& to zero (for example, by using budget returns).
You can display the distributable budget in each project budgeting
function by setting the view for "distributable."
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
AP197
- Übergeordnetes PSP-Element hat bereits eigenes Budget ?Get instant SAP help. Start your 7-day free trial now.
AP196
Übergeordnetes PSP-Element &1 ist Kontierungselement
Was verursacht dieses Problem? You want to assign WBS element &V2& to an investment program position. WBS element &V1&, which is ne...
AP195
Fehler - Funktion nicht ausführbar
Was verursacht dieses Problem? You used point of entry position &V1& to enter structure maintenance of an investment program, and you tried...
AP198
Übergeordnetes PSP-Element hat bereits eigenes Budget
Was verursacht dieses Problem? An appropriation request is assigned to an investment program position, or is to be assigned to an investment progra...
AP199
Maßnahme/Maßnahmenanforderung wird noch in Investitionsprogramm verwendet
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.