How To Fix AP102 - Auftrag &1 bereits budgetiert oder Verf.kontrolle aktiv


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AP - Investment program messages

  • Message number: 102

  • Message text: Auftrag &1 bereits budgetiert oder Verf.kontrolle aktiv

  • Show details Hide details
  • Was verursacht dieses Problem?

    You tried to attach order &V1& to an investment program position.
    However, the specifications for this program position state that the
    orders assigned below it in the hierarchy must receive their budget
    from this program position.
    Order &V1&, which you want to attach, however, already has a budget
    that does <ZH>not</> originate from an investment program. Or,
    availability control is still active for the order.

    Systemantwort

    In order to avoid inconsistency, the order is not attached to the
    program position.

    Wie behebe ich diesen Fehler?

    First set the already existing budget of order &V1& to 0 (for example,
    using budget returns). And, if necessary, deactivate the availability
    control for the order.
    Then you can attach the order to the program position, and distribute
    the budget from the program position to the order.
    If you want to avoid deactivating availability control, there is
    another option. You can remove 'budgeted' status on the order
    (transaction OK12). To be able to remove 'budgeted' status, you have to
    reduce the current overall and annual budget on the order to zero, and
    - very important - you have to use the <ZH>same</> business transaction
    (original, supplement, return ... ) as was used for entering the
    original budget!
    If the current overall and annual budgets already consist of more than
    one business transaction, then you have to remove each of the budgets
    separately according to the business transaction used. (In order to
    avoid temporary inconsistencies, you should also ideally do this in the
    reverse order to that in which the budget was posted.)
    <ZH>Example</>
    You create a current overall budget as follows:
    RESET N1.
    Original budget 1000
    Supplement 200
    Return 50
    To remove 'budgeted' status from the order, it is not enough to enter a
    return of 1150, for example, even though this would reduce the current
    overall budget to zero.
    Instead you have to reduce the current overall budget to zero in the
    following sequence:
    RESET N1.
    Return 50-
    Supplement 200-
    Set original budget of 1000 to 0.
    You can only remove 'budgeted' status on the order (transaction OK12)
    after following these steps.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler AP102 - Auftrag &1 bereits budgetiert oder Verf.kontrolle aktiv ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author