How To Fix AO245 - Wirtschaftlichkeitskennzahlen wurden neu ermittelt


AO245 - Overview

  • Message type: E = Error

  • Message class: AO - Appropriation requests - Master data / Customizing

  • Message number: 245

  • Message text: Wirtschaftlichkeitskennzahlen wurden neu ermittelt

  • Show details Hide details
  • Was verursacht dieses Problem?

    You chose the 'calculate preinvestment analysis figures' function. The
    function was carried out.

    Systemantwort

    The system determined the preinvestment analysis figures based on the
    planned costs and revenue, and the yield curve that was defined in
    Customizing. The system also used the value date that was specified in
    Customizing.

    Wie behebe ich diesen Fehler?

    Check the figures determined for the payback period, the net present
    value, internal rate of return and the discounted cash flow rate.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler AO245 - Wirtschaftlichkeitskennzahlen wurden neu ermittelt ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker