Message type: E = Error
Message class: AJ - Billing program
Message number: 102
Message text: Die Endabrechnung kann noch nicht durchgeführt werden
You have attempted to execute a period-end billing. You have specified
in rate category &v1& that a minimum of &v2& days must pass since the
last period billing before the period-end billing can occur. The last
period billing was on &v3& and only &v4& have passed since then.
Therefore, period-end billing cannot be executed yet.
Wait until the required &v2& days have passed since the last period
billing before you execute the period-end billing.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
AJ102
- Die Endabrechnung kann noch nicht durchgeführt werden ?Get instant SAP help. Start your 7-day free trial now.
AJ101
Die Anzahl der Leistungsspitzen des Operanden &1 ist gleich null
Was verursacht dieses Problem? During preprocessing of demand, the system has determined that no demand peaks have been defined for operand &v1...
AJ100
Operand &1 ist saisonabhängig, es wurde aber keine Saison definiert
Was verursacht dieses Problem? When operand &v1& was defined using Transaction EA51, the indicator for season demand was set. However, no s...
AJ103
Die Portion hat sich innerhalb der Nachberechnungsperiode geändert
Was verursacht dieses Problem? You changed the portion from &v1& to &v2& for the contract. You made this change within a backbillin...
AJ104
Die Ableseeinheit hat sich innerhalb der Nachberechnungsperiode geändert
Was verursacht dieses Problem? You changed the meter reading unit from &v1& to &v2& for the contract. You made this change within a...