How To Fix AJ099 - Es wurde kein gültiger Abschlagszeitraum ermittelt


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AJ - Billing program

  • Message number: 099

  • Message text: Es wurde kein gültiger Abschlagszeitraum ermittelt

  • Show details Hide details
  • Was verursacht dieses Problem?

    A new budget billing plan is to be created for periodic billing. In
    this process, an extrapolation is performed for the budget billing
    period. &v1& -- &v2& has been determined as the budget billing period,
    but this period is invalid. The end (&v2&) of the budget billing period
    was determined from the schedule records for meter reading unit &v3&.

    Systemantwort

    Wie behebe ich diesen Fehler?

    Check the schedule records of meter reading unit &v3& for consistency,
    and change them if necessary. When doing this, also check the schedule
    records of the allocated portion &v4&.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler AJ099 - Es wurde kein gültiger Abschlagszeitraum ermittelt ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author