How To Fix 6P030 - Verwendete Bedarfsart & ist nicht vorgesehen


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 6P - Messages for planned independent requirements (Appl.area 60)

  • Message number: 030

  • Message text: Verwendete Bedarfsart & ist nicht vorgesehen

  • Show details Hide details
  • Was verursacht dieses Problem?

    The requirements typs is not defined as a strategy for the material in
    the strategy group.

    Systemantwort

    The strategies allowed for planning a material are recorded in
    Customizing for demand management in the strategy group. The strategy
    group can either be allocated to the material in the material master
    record, either directly or via the MRP group. The system uses the
    strategy group to find the correct requirements type when creating or
    changing planned independent requirements.
    If you enter a requirements type that is not included in the strategy
    group, the system displays a warning or an error message.
    &HINWEIS&
    If you entered a strategy group in the material master record, you must
    enter a requirements type in the <LS>requirements type</> field.
    Here, the system determines the requirements type that was entered as
    the main strategy in the strategy group and proposes this value.
    This default value can be overwritten by one of the alternative
    strategies in the strategy group, if lore strategies were defined.

    Wie behebe ich diesen Fehler?

    Check the strategy group or the MRP group in the material master
    record. Does the strategy group contain the strategies or the
    requirement type that you require?
    <DS:TRAN.MM02>Proceed</>
    If necessary, check the strategy groups in Customizing. Does the
    strategy group contain the strategies you require?
    <DS:TRAN.OPPT>Proceed</>
    If necessary, check the allocations of the strategy groups to the MRP
    groups in Customizing.
    <DS:TRAN.OPPU>Proceed</>

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler 6P030 - Verwendete Bedarfsart & ist nicht vorgesehen ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant