How To Fix 6A555 - Plankostenverteilung auf der baulichen Maßnahme unvollständig


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 6A - Real estate messages rent adjustment

  • Message number: 555

  • Message text: Plankostenverteilung auf der baulichen Maßnahme unvollständig

  • Show details Hide details
  • Was verursacht dieses Problem?

    You want to make a rental adjustment due to a constructive measure. You
    have two options for specifying how the total costs can be apportioned
    to the participating rental units:
    Indirectly by entering an apportionment unit (e.g. living area)
    Directly by entering costs to the rental units
    In this case you have not entered an apportionment unit nor have you
    distributed planned costs to all the participating rental units.

    Systemantwort

    The system indicates that there could be an error.

    Wie behebe ich diesen Fehler?

    Continue processing if some of the rental units are not to be assigned
    planned costs or enter the planned costs for the rental units that
    should have some.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler 6A555 - Plankostenverteilung auf der baulichen Maßnahme unvollständig ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker