Do you have any question about this error?
Message type: E = Error
Message class: 63 - Messages for Real Estate Management
Message number: 142
Message text: Gültig-bis-Datum fällt in eine abgerechnete Periode
The valid-to date for the settlement unit is within a settlement period
that has already settled. The data that was processed for this
settlement cannot be changed retroactively.
The system does not accept the date.
Enter a different date.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
63142
- Gültig-bis-Datum fällt in eine abgerechnete Periode ?Get instant SAP help. Start your 7-day free trial now.
63141
Zur nächsten Periode ist Abrechnungseinheit nicht mehr gültig
Was verursacht dieses Problem? The settlement unit is no longer valid for the next settlement period. Therefore this settlement period cannot be us...
63140
Gültig-bis-Datum liegt vor der ersten Zuordnung
Was verursacht dieses Problem? The settlement unit only exists from the date &v1&. Therefore it cannot be ended on an earlier date.Systeman...
63143
Gültig-bis-Datum liegt vor Bezugsdatum & einer Rechnung
Was verursacht dieses Problem? An invoice with reference date &v1& was assigned to the settlement unit. The settlement unit must be valid f...
63144
Gültig-bis-Datum liegt vor der letzten Zuordnung
Was verursacht dieses Problem? There can be no assignment after the valid-to date of the settlement unit. However, there is one from the date &...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.