How To Fix 62267 - Abzurechnende Periode &-& zeitlich nicht abgeschlossen


62267 - Overview

  • Message type: E = Error

  • Message class: 62 - Message Texts for Real Estate

  • Message number: 267

  • Message text: Abzurechnende Periode &-& zeitlich nicht abgeschlossen

  • Show details Hide details
  • Was verursacht dieses Problem?

    You want to carry out a full settlement. However, the settlement date
    is within the period you want to settle. This is not allowed.

    Systemantwort

    The full settlement is not carried out.

    Wie behebe ich diesen Fehler?

    Check your entries for the settlement period and correct the settlement
    period you have entered, if necessary.
    If you wish to carry out an early final settlement, set the valid-to
    date in the selected settlement units accordingly.
    The settlement date may lie within the period to be settled if all
    participating settlement units have a valid-to date that lies before
    the settlement date (current date). This is necessary, for example, if
    the business entity to be settled has been sold and a final settlement
    must be carried out before year-end.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


62267 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker