How To Fix 61710 - Planauftrag &1 nicht löschbar. WE-Menge ist größer als Null.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 61 - Fehlermeldungen fuer Bedarfsplanung

  • Message number: 710

  • Message text: Planauftrag &1 nicht löschbar. WE-Menge ist größer als Null.

  • Show details Hide details
  • Was verursacht dieses Problem?

    When copying planned orders from long-term planning to MRP, the system
    deletes existing planned orders in MRP that lie in the period for
    copying. This is, however, not always possible. Planned order &V1& has
    already been partially confirmed, that is, it contains a quantity of
    goods received. Because of this, the system cannot delete the planned
    order during the copying of planned orders from long-term planning.

    Systemantwort

    The system did not delete planned order &v1&. The planned order remains
    in the period for copying. An additional element now exists in the
    specified period to cover a requirement.

    Wie behebe ich diesen Fehler?

    Edit the planning results manually to correct any excess coverage by
    the MRP run.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler 61710 - Planauftrag &1 nicht löschbar. WE-Menge ist größer als Null. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant