Do you have any question about this error?
Message type: E = Error
Message class: 40 - Messages for Process Orders
Message number: 109
Message text: Herstellanw. (StE &1) in Phase &2 ist für Chargenprot. nicht verwendbar
It was specified in the order type-dependent parameters for order type
&V4& that a <LS>Batch record is required</> for the process order.
Destination type &V3& was defined for control recipe destination &V1&
of phase &V2&. This destination generates a browser-based PI sheet.
The batch record (transaction COEBR) can only process the ABAP
list-based PI sheet and not the browser-based PI sheet. For this
reason, the browser-based PI sheet cannot be documented. All other
documents can, however, be used.
If the documentation of the browser-based PI sheet is not required,
&V3& can be used as the destination type. Otherwise the ABAP list-based
PI sheet (destination type 1) must be used.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
40109
- Herstellanw. (StE &1) in Phase &2 ist für Chargenprot. nicht verwendbar ?Get instant SAP help. Start your 7-day free trial now.
40108
Fehler in der Berechtigungsprüfung Aktivität, Auftragsart und Werk
Was verursacht dieses Problem? An error occurred during an authorization check for changing or displaying a process order because a required value ...
40107
Auftrag &1, Vorgang &2: Ressource weicht vom genehmigten Rezept ab
Was verursacht dieses Problem? You have created a process order that requires approval for an approved recipe. A resource has, however, been assign...
40110
Bitte mindestens einen Positionstyp für Komponenten markieren
Was verursacht dieses Problem? In the section <LS>Components with item types</>, you have not selected any item types.Systemantwort F...
40111
Bitte im Abschnitt 'Chargenzuordnung' mindestens einen Eintrag markieren
Was verursacht dieses Problem? You have not selected anything in the <LS>Batch assignment</> area.Systemantwort For the scope of gene...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.