How To Fix 3F298 - Es konnte keine gültige Planperiode ermittelt werden


3F298 - Overview

  • Message type: E = Error

  • Message class: 3F - Compensation Management

  • Message number: 298

  • Message text: Es konnte keine gültige Planperiode ermittelt werden

  • Show details Hide details
  • Was verursacht dieses Problem?

    You want to execute a compensation adjustment. However, this is not
    possible as the system could not determine a planning period. A number
    of things may have caused this:
    There are no planning periods in the system.
    There are no adjustment types in the system.
    The existing planning periods and adjustment types do not match.

    Systemantwort

    You can not carry out the compensation adjustment.

    Wie behebe ich diesen Fehler?

    Contact your system administrator.

    Vorgehensweise für Systemadministratoren

    If the planning periods or adjustment types which you require are not
    available, set them up, by entering the relevant values in the
    <LS>Compensation Management</> IMG in the steps
    <DS:SIMG.SIMG_OHCMP_0030>Define Planning Periods</> or
    <DS:SIMG.SIMG_OHCMP_5120>Define Adjustment Types</>.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler 3F298 - Es konnte keine gültige Planperiode ermittelt werden ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant