How To Fix 29082 - Stücklistenstatus sieht keine Vorgangszuordnungen vor


29082 - Overview

  • Message type: E = Error

  • Message class: 29 - Bills of Material

  • Message number: 082

  • Message text: Stücklistenstatus sieht keine Vorgangszuordnungen vor

  • Show details Hide details
  • Was verursacht dieses Problem?

    You want to allocate a material component to an operation in a routing.
    This is only possible if the BOM has a status for which the indicator
    <LS>Released for work scheduling</> is set in Customizing (BOM status).
    The BOM you are editing does not have a status with this indicator.

    Wie behebe ich diesen Fehler?

    You cannot allocate the material component to a routing until:
    the BOM is given a status with the indicator <LS>Released for work
    scheduling</>
    the settings in Customizing (BOM status) are changed to include this
    indicator for the selected status

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


29082 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker