How to use /SAPAPO/PMONDEF - Definición esquema ratios


SAP Transaction Code - Details

  • Transaction Code: /SAPAPO/PMONDEF

    Description: Definición esquema ratios

    Release: S/4HANA only

    Menu Path:

    • Logistics > Advanced Planning > Monitoring > Current Settings > Define Key Figure Schema
  • Show technical details Hide technical details
    • Program: /SAPAPO/SAPLPMON_APPL

      Screen: 200

      Authorization Object:

    • Development Package: /SAPAPO/PMON

      Package Description: Plan Monitor

      Parent Package: /SAPAPO/APO_STRUCTURE

    • Module/Component: SCM-APO-PPS

      Description: Production Planning and Detailed Scheduling


Smart SAP Assistant

  • SAP Tcode: /SAPAPO/PMONDEF - Definición esquema ratios
    
    Overview:
    The SAP transaction code /SAPAPO/PMONDEF is used to define key figure schemas in the SAP Advanced Planning and Optimization (SAP APO) system. It is used to create and maintain key figure schemas, which are used to define the characteristics of key figures in the system. 
    
    Functionality: 
    The /SAPAPO/PMONDEF transaction code allows users to define key figure schemas in SAP APO. Key figure schemas are used to define the characteristics of key figures, such as their data type, unit of measure, and aggregation type. This transaction code also allows users to assign a key figure schema to a specific planning area. 
    
    Step-by-step How to Use: 
    1. Enter the transaction code /SAPAPO/PMONDEF into the command field. 
    2. Select the “Create” button to create a new key figure schema. 
    3. Enter a name for the new key figure schema and select “Continue”. 
    4. Enter the characteristics of the key figure, such as its data type, unit of measure, and aggregation type. 
    5. Select “Save” to save the new key figure schema. 
    6. Select “Assign” to assign the new key figure schema to a specific planning area. 
    7. Select “Save” to save the assignment of the key figure schema to the planning area. 
    
    Other Recommendations: 
    It is important to note that when creating or modifying a key figure schema, it is important to ensure that all of the characteristics are correctly entered and saved before assigning it to a planning area. Additionally, it is important to ensure that all changes are tested thoroughly before they are implemented in production systems.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:

Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant