How to use /SAPAPO/OPT_DPL - DPL Optimizer GUI: Initial Screen


SAP Transaction Code - Details

  • Transaction Code: /SAPAPO/OPT_DPL

    Description: DPL Optimizer GUI: Initial Screen

    Release: S/4HANA only

  • Show technical details Hide technical details
    • Program: /SAPAPO/SAPLOPT_SNP_GUI

      Screen: 100

      Authorization Object:

    • Development Package: /SAPAPO/OPT

      Package Description: Optimization

      Parent Package: /SAPAPO/APO_STRUCTURE

    • Module/Component: SCM-APO-OPT

      Description: Optimization


Smart SAP Assistant

  • SAP Tcode: /SAPAPO/OPT_DPL - DPL Optimizer GUI: Initial Screen
    
    Overview:
    The SAP transaction code /SAPAPO/OPT_DPL is used to access the DPL Optimizer GUI. This GUI is used to optimize the supply chain network and create a plan for the distribution of goods. It allows users to create and manage supply chain networks, optimize them, and generate plans for the distribution of goods. 
    
    Functionality:
    The DPL Optimizer GUI provides users with a graphical interface to create and manage supply chain networks. It allows users to define the parameters of their supply chain network, such as the number of warehouses, transportation costs, and inventory levels. The GUI also provides users with the ability to optimize their supply chain network by running simulations and analyzing the results. Finally, it allows users to generate plans for the distribution of goods based on their optimized supply chain network. 
    
    Step-by-step How to Use:
    1. Access the DPL Optimizer GUI by entering the transaction code /SAPAPO/OPT_DPL in the SAP command field. 
    2. Create a new supply chain network by entering the necessary parameters in the appropriate fields. 
    3. Run simulations to optimize your supply chain network. 
    4. Analyze the results of your simulations and make any necessary adjustments to your supply chain network. 
    5. Generate a plan for the distribution of goods based on your optimized supply chain network. 
    
    Other Recommendations:
    It is recommended that users familiarize themselves with all of the features and functions of the DPL Optimizer GUI before using it to create and manage their supply chain networks. Additionally, users should ensure that they have all of the necessary data available before running simulations or generating plans for the distribution of goods.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:

Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant