Message type: E = Error
Message class: V4 - Nachrichten Verkauf (Variable Meldungen und EDI-Meldungen)
Message number: 330
Message text: L'échéance n'a pas été confirmée pr &1 ds division &2.
A schedule line for material &V1& in plant &V2& is not confirmed. This
can be due to one of the following causes:
There was a date shift because of the delivery scheduling.
During the update of a confirmation for a sales scheduling agreement
item, a delivery was scheduled for the schedule lines to be updated.
Here the material availability date is determined from the requested
delivery date in backward scheduling. If, as a result of scheduling, the
system finds a date that is in the past, the system switches to forward
scheduling, possibly from the current date. Schedule lines are created
in the results. The schedule lines are different from those that
originate from the APO system.
The assignment of schedule line categories to the sales document item
type is incorrect.
To confirm all schedule lines when updating the sales documents, it is
necessary that the schedule lines that are relevant for delivery or MRP
are assigned to the item category of the sales document.
The system terminates the processing, because a delivery schedule for a
scheduling agreement can only be created if the schedule lines are
confirmed according to the appointments and quantities transferred.
Check the following system settings:
In transaction <DS:TRAN.OVLY>OVLY</> (Sales Documents: Types -
Scheduling) check whether the "Backward Scheduling Only" indicator is
set for the type of sales document to be updated. If not, set the
indicator, and start the transfer from the APO system again.
In transaction <DS:TRAN.VOV5>VOV5
</>(Assign Schedule Line Categories), check whether the correct schedule
line categories are assigned to the type of sales document items to be
transferred. If not, assign the correct schedudule line categories, and
start the transfer from the APO system again.
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
V4330
- L'échéance n'a pas été confirmée pr &1 ds division &2. ?Get instant SAP help. Start your 7-day free trial now.
V4329
Prog. livraisons ADV APO : création/modif. appels uniq. possible ds APO
Quelle est la cause de ce problème? The sales scheduling agreement item is contained in an active integration model and is planned within APO manag...
V4328
Aucun horizon appel horaire n'a été saisi dans le poste &1
Quelle est la cause de ce problème? You changed or created a JIT delivery schedule for item &V1& in a delivery schedule with an external se...
V4331
Aucun appel planifié dans poste &2
Quelle est la cause de ce problème? Planning delivery schedule instruction &V3& is entered in sales scheduling agreement &V1&, item...
V4332
Le changement d'exercice comptable est incohérent
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
Cliquez sur ce lien pour rechercher tous les messages SAP.