How To Fix PPEBAL208 - La validité de l'équilibrage de ligne &1 dépasse la date 31.12.2037.


PPEBAL208 - Overview

  • Message type: E = Error

  • Message class: PPEBAL - Line Balance Message

  • Message number: 208

  • Message text: La validité de l'équilibrage de ligne &1 dépasse la date 31.12.2037.

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You have edited the Valid-From Date for the line balance &V1&. However,
    the SAP liveCache determines the last possible date here as 31.12.2037.

    Réponse du système

    In line explosion, the system uses the line balance to build the
    assignments between the components and the production supply areas. The
    system adjusts the validities of the CMP-PSA assignments to the date
    defined in the SAP liveCache. As a result, duplicates might occur, which
    can lead to problems when the system writes the PSA cluster to the SAP
    liveCache.

    Comment corriger cette erreur?

    Set the Valid-From Date for the line balance &V1& to before 31.12.2037.

    Procédure pour les administrateurs système

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


PPEBAL208 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author