Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 016
Message text: Centre & pas entièrement créé
Cost center &V1& in controlling area &V2& has not been fully defined
for the time interval &V3& to &V4&.
The cost center cannot be assigned.
Check your entries. Either select a different cost center, extend the
validity period of cost center &V1&, or delimit the interval in which
you want to assign the cost center.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KW016
- Centre & pas entièrement créé ?Get instant SAP help. Start your 7-day free trial now.
KW015
Périmètre analytique & sans hiérarchie std. (veuillez affecter une hiér.)
Quelle est la cause de ce problème? Before you can create a <GL:business_process>business process</>, you must assign a <GL:standard...
KW014
Le regroupement & n'est pas lié à la zone Centre
Quelle est la cause de ce problème? The group you entered has been created, but not for the "Cost centers" field.Comment corriger cette e...
KW017
Caractéristiques & inexistantes
Quelle est la cause de ce problème? Attribute &V1& is not defined in controlling area &V2&.Réponse du système Le système émet ...
KW018
Hiérarchie bloquée : modification actuellement impossible
Quelle est la cause de ce problème? Either the process group or the entire standard hierarchy is being used by user &v1& at present. You ca...
Cliquez sur ce lien pour rechercher tous les messages SAP.