Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 276
Message text: &: coûts malgré activité 0
Plan activity and posted activity for &V1& are both 0. Nevertheless,
costs were planned or posted.
The price for &V1& cannot be calculated as it would involve division by
zero. The costs can therefore not be included in the price calculation.
For plan price calculation, check planning of &V1& and its cost
planning for period(s) &V3&.
For actual price calculation, check postings made to &V1& in period(s)
&V3&.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KP276
- &: coûts malgré activité 0 ?Get instant SAP help. Start your 7-day free trial now.
KP275
&: fluctuation du prix politique
Quelle est la cause de ce problème? You set a manual activity price in &V1&. Simultaneously, an annual price is calculated for version &...
KP274
&: activité est 0
Quelle est la cause de ce problème? Planning of activity quantities for &V1& in period(s) &V3& is not reconciled. Plan activity for...
KP277
&: réf. activité pour activité 0
Plan activity for &V1& is 0. Nevertheless, activity input was planned for &V2&.Réponse du système The activity price for this acti...
KP278
Relations d'activités par itération partielle
Quelle est la cause de ce problème? In the iterative price calculation framework, the system detected an assignment between &V1& and &V...