Message type: E = Error
Message class: KK -
Message number: 059
Message text: Les données prises en cpte ds le CCR ont été modif. -> ajustez le CCR
You have made changes to master data that are relevant to costing (such
as the costing sheet, overhead key, plant, or profit center). This can
result in inconsistencies between the master data and the cost estimate
concerned.
The system does not allow you to save the master data.
Go to the cost estimate by choosing the <LS>Change cost estimate</>
function, and save it again. This updates the master data, which you
can then saved.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
KK059
- Les données prises en cpte ds le CCR ont été modif. -> ajustez le CCR ?Get instant SAP help. Start your 7-day free trial now.
KK058
Il existe plus d'un calcul du CR doté de la clé &
Quelle est la cause de ce problème? The system found more than one cost estimate that has the key &v1&. This means that you cannot copy the...
KK057
Le calcul du CR n'a pas pu être sélectionné
Quelle est la cause de ce problème? One of the cost estimates to be selected does not exist.Réponse du système Processing was canceled.Comment c...
KK060
Aucune clé de lissage définie pour le schéma de CCR
Quelle est la cause de ce problème? Costing sheet &v1& does not allow an overhead key.Réponse du système Le système émet un message d'...
KK061
Pas d'autorisation poue créer des CCR type ds le pér. ana. &
Quelle est la cause de ce problème? You do not have authorization to create base planning objects in controlling area &V1&. INCLUDE NA_AUTH...
Cliquez sur ce lien pour rechercher tous les messages SAP.