Do you have any question about this error?
Message type: E = Error
Message class: K8 - CO Planning: Messages for Function Group KAPP
Message number: 066
Message text: Centre/type d'act. &/& et proc. de gestion émetteur & non prévu
You have entered the values &v1&/&v2& for the sender cost
center/activity type characteristics, and at the same time the value
&v3& for the sender business process.
Within a planning record, you can plan either an activity input from a
cost center/activity type or a process input from a business process.
You must opt for one of these alternatives. Both information types are
not allowed within one planning record.
The entry or the characteristics combination is not accepted.
If you have just entered these values in a new line,
remove either the values &v1&/&v2& for the sender cost center/activity
type characteristics or the value &v3& for the sender business process.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
K8066
- Centre/type d'act. &/& et proc. de gestion émetteur & non prévu ?Get instant SAP help. Start your 7-day free trial now.
K8065
Valeur initiale pr centre de cts émet. uniq. autorisée avec ty. act. ém.
Quelle est la cause de ce problème? You included the initial selection criteria value for the characteristic"Sender cost center" (for ins...
K8064
Valeur init. pr type d'act. émett. ne peut pas être utilisée pr pr. chge
INCLUDE K8063 OBJECT DOKU ID NAExtrait du message d'erreur du système SAP. Copyright SAP SE. ...
K8067
Données pré-budgétées sauvegardées en mémoire temporaire
Quelle est la cause de ce problème? You saved the planning data you entered, so it is therefore available for further processing in other planning ...
K8068
Pré-budgétisation des types d'activ. non effectuée pr &/&
Quelle est la cause de ce problème? You want use the sender cost center / activity type &V1&/&V2& combination. However, no activity...
Cliquez sur ce lien pour rechercher tous les messages SAP.