Do you have any question about this error?
Message type: E = Error
Message class: IF - Messages re interest accounting in PS/CO/IM
Message number: 134
Message text: Hiérarchie incomplète pour cet objet
The hierarchy determined for the relevant object is incomplete.
One of the following applies:
A lower-level WBS element was selected without its higher level
hierarchy
A network or network activity was read without the assigned WBS
element.
A network is assigned directly to a project definition.
In the interest calculation, characteristics from the hierarchy are
inherited by lower level objects. To prevent data breakdowns, objects
with incomplete hierarchy information are not processed.
If possible, use only the project definition to make your selection in
the interest calculation. This ensures that the complete project
hierarchy is selected.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
IF134
- Hiérarchie incomplète pour cet objet ?Get instant SAP help. Start your 7-day free trial now.
IF133
Indiquez la déf. de projet ou l'élt d'OTP ou le réseau/l'activité
Quelle est la cause de ce problème? Possible causes: Sender specification incomplete Sender specification unclearRéponse du système Comment corri...
IF132
Calcul d'intérêts au "réel" non autorisé
Quelle est la cause de ce problème? Status &V1& is set for <DS:GLOS.balancing_object>balancing object</>. This status does not ...
IF135
Date incomplète. Complétez vos données ou n'entrez pas de date
Quelle est la cause de ce problème? The start/finish date specifications for the interest run are incomplete.Réponse du système INCLUDE NA_ALLG_...
IF136
Impossible de déterminer la date de fin calcul des intérêts pr cet objet
Quelle est la cause de ce problème? No finish date has been maintained for the object. The planned interest calculation uses the scheduled WBS elem...
Cliquez sur ce lien pour rechercher tous les messages SAP.