How To Fix CY712 - Ordre & : opé. & : temps inter-opératoire maxi. avec l'opé. & excédé


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CY - Capacity Requirements Planning

  • Message number: 712

  • Message text: Ordre & : opé. & : temps inter-opératoire maxi. avec l'opé. & excédé

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You want to schedule an operation of a process order. A maximum
    interoperation time or an overlap with a predecessor operation has been
    defined via the relationships between the assigned phases.
    The scheduling result has led to a violation of this restriction. The
    reason for this was either manual plannung or missing capacity at the
    resource.

    Comment corriger cette erreur?

    Please reschedule the operation manually or
    reschedule a different occupancy.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP CY712 - Ordre & : opé. & : temps inter-opératoire maxi. avec l'opé. & excédé ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author