How To Fix CX038 - Configuration incomplète


CX038 - Overview

  • Message type: E = Error

  • Message class: CX - Nachrichten für Konfigurationsprozess

  • Message number: 038

  • Message text: Configuration incomplète

  • Show details Hide details
  • Quelle est la cause de ce problème?

    Your configuration is not yet complete. The BOM still contains
    configurable components that have not yet been configured.
    Settings in the configuration profile determine whether you can
    configure the components directly or infer values for the components
    from the characteristic values assigned to the superior material.

    Réponse du système

    The system does not transfer material requirements to MRP until the
    configuration is complete and consistent.

    Comment corriger cette erreur?

    Select the <PF>Conf. structure</> pushbutton. You see an overview of
    all configurable assemblies in the BOM and their configuration status.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


CX038 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker