How To Fix CP325 - Séquence &/&/& : numéro d'opération incorrect


CP325 - Overview

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 325

  • Message text: Séquence &/&/& : numéro d'opération incorrect

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The number of the last operation in sequence &V3& of task list &V1&
    &V2& is greater than the number of the return operation in the standard
    sequence.
    However, the last operation in parallel and alternative sequences
    must have a number less than the number of the operation after the
    return operation in the standard sequence.

    Comment corriger cette erreur?

    Check the task list and
    correct the operation numbers in sequence &V3&
    <ZH>or</>
    correct the operation numbers in the standard sequence.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


CP325 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker