Do you have any question about this error?
CN
›
CN753
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 753
Message text: Il existe des composants qui ont déjà été (partiellement) prélevés
You want to change the assignment of an activity to a WBS element.
The activity has been assigned components that are managed in
individual stock and that have already been (partially) withdrawn. It
is not possibe to change the WBS element because:
The new WBS element does not manage individual stock
The old WBS element manages valuated stock, the new WBS element
unvaluated stock
Both WBS elements manage unvaluated stock, but have different
controlling areas, company codes, business areas, or profit centers.
Both WBS elements manage valuated stock, but have different controlling
areas
Check the WBS assignments of the components in the relevant activities.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CN753
- Il existe des composants qui ont déjà été (partiellement) prélevés ?Get instant SAP help. Start your 7-day free trial now.
CN752
Article &1: qté requise &2 inférieure à qté prélevée &3.
Quelle est la cause de ce problème? You have reduced the requirement quantity for a material component, however the quantity already withdrawn is l...
CN751
Article & non prévu pour besoin indépendant prévisionnel
Quelle est la cause de ce problème? You want to generate planned independent requirements for a material, but the material does not allow this.Ré...
CN754
L'intervalle n'est pas pris en cpte pr la date de besoin déf. manuellemt
Quelle est la cause de ce problème? You use the time interval to define a lead time or a follow-up time for a activity-based requirements date; you...
CN755
Une imputation/affectation de stock alternative n'est pas possible
Quelle est la cause de ce problème? You want to change the account/stock assignment for a component.Réponse du système No account/stock assignme...
Cliquez sur ce lien pour rechercher tous les messages SAP.