Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix CK395 - Aucun CCR budgété futur adéquat n'a pu être repris


CK395 - Overview

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 395

  • Message text: Aucun CCR budgété futur adéquat n'a pu être repris

  • Show details Hide details
  • Quelle est la cause de ce problème?

    For material &v1& in plant &v2&, the system tries to find a future
    standard cost estimate according to the transfer strategy. The system
    could not find a future standard cost estimate although the material
    master record contains a future planned price.
    This is due to any of the following:
    A new cost estimate overwrote the old costing results.
    The old results were deleted in a reorganization run.

    Réponse du système

    If there are more transfer strategies for transfer control key &v3& in
    Customizing, the system looks for the appropriate costing results.

    Comment corriger cette erreur?


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


CK395 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker