Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 716
Message text: Immob. en cours non autorisée pr &
You want to assign WBS element &V1& to an asset under construction.
The requesting (responsible) cost center in the WBS element is copied
into the asset under construction. The prerequisite is that the
controlling area of the WBS element and requesting cost center are the
same.
Note: From Release 3.0F, the responsible cost center is copied to the
asset under construction if no requesting cost center was entered.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
Correct the requesting cost center, if necessary.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
CJ716
- Immob. en cours non autorisée pr & ?Get instant SAP help. Start your 7-day free trial now.
CJ715
Veuillez entrer un niveau
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
CJ714
Elt d'OTP statistique : pas de coûts addit., imputation, etc.&
Quelle est la cause de ce problème? A statistical WBS element cannot be settled, nor carry overheads, nor can results analysis be carried out for i...
CJ717
Projet partiel & non autorisé (vérifiez votre entrée)
Quelle est la cause de ce problème? Subproject &V1& does not exist.Réponse du système Processing stopped.Comment corriger cette erreur? ...
CJ718
Devise de la société demandeuse doit être identique à devise société
Quelle est la cause de ce problème? The currency of the requesting company code is different to the currency of the WBS elemnt company code.Répons...
Cliquez sur ce lien pour rechercher tous les messages SAP.