Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here →
Message type: E = Error
Message class: AJ - Billing program
Message number: 102
Message text: Le calc. de fact. de régul. ne pt pas encore être exécuté.
You have attempted to execute a period-end billing. You have specified
in rate category &v1& that a minimum of &v2& days must pass since the
last period billing before the period-end billing can occur. The last
period billing was on &v3& and only &v4& have passed since then.
Therefore, period-end billing cannot be executed yet.
Wait until the required &v2& days have passed since the last period
billing before you execute the period-end billing.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
AJ101 Le nombre de valeurs de pointe de puissance de l'opérande &1 est nul.
Quelle est la cause de ce problème? During preprocessing of demand, the system has determined that no demand peaks have been defined for operand &a...
AJ100 L'opérande &1 dépend de la saison mais auc. saison n'a été définie.
Quelle est la cause de ce problème? When operand &v1& was defined using Transaction EA51, the indicator for season demand was set. However,...
AJ103 La portion a changé dans la période de facture d'ajustement.
Quelle est la cause de ce problème? You changed the portion from &v1& to &v2& for the contract. You made this change within a backb...
AJ104 L'unité de relevé a changé dans la période de facture d'ajustement.
Quelle est la cause de ce problème? You changed the meter reading unit from &v1& to &v2& for the contract. You made this change wit...
Cliquez sur ce lien pour rechercher tous les messages SAP.