How To Fix AH690 - Ecart résult. de rel. : dte min. &1 dte max. &2.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AH - IS-U billing (master data)

  • Message number: 690

  • Message text: Ecart résult. de rel. : dte min. &1 dte max. &2.

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The meter reading results corresponding to the meter reading order were
    not recorded on the same day.
    The earliest and most recent meter reading results are from the
    specified period.
    This means that it is not possible to determine the end of the billing
    period.

    Réponse du système

    Processing is canceled.

    Comment corriger cette erreur?

    Ensure that all the meter reading results that are to be allocated to
    the billing order are always taken on the same day.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP AH690 - Ecart résult. de rel. : dte min. &1 dte max. &2. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker