How To Fix AD_SUBCON201 - Ordre de remise à neuf avec sous-traitance non valable (voir texte desc.)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AD_SUBCON - Messages for Subcontracting

  • Message number: 201

  • Message text: Ordre de remise à neuf avec sous-traitance non valable (voir texte desc.)

  • Show details Hide details
  • Quelle est la cause de ce problème?

    You have carried out a consistency check and errors occurred in one of
    the following areas:
    Main components should be assigned in the following way:
    First internal operation within the internal operations before the first
    external subcontracting (this would be the first main component),
    Every external subcontracting operation
    First internal operation after the last external subcontracting
    First internal operation between 2 external subcontracting operations
    Planned modification: one planned modification is possible in the whole
    REFO during creation. For example, only one reservation with Material
    Provision Indicator (MPI) 'X' <ZK>Rework Material from Subcontractor</>.
    Material Provision Indicator: every main component which is relevant for
    good issue should have MPI 'S' <ZK>Rework Material </>for external
    subcontracting or a planned modification in REFO. In case of planned
    modification, the operation - where the planned modification takes place
    - has two reservations: one with MPI 'S' <ZK>Rework Material </>which is
    sent out and one with MPI 'X' <ZK>Rework Material from Subcontractor</>
    which is received back to stock.
    Material numbers and quantities:
    Without planned modification, every main components should have the same
    material number and quantity as used on the header screen.
    With planned modification, before the material exchange, every main
    component should have a 'from' material. After the material exchange,
    every main components should have a 'to' material.
    Special stock assignment: every main component should have the same
    special stock assigment in the refurbishment order.
    MRP relevance: if internal operation(s) precede an external
    subcontracting operation, then MRP relevance display would be incorrect
    (the goods issued components of the internal processes is lost from a
    MRP relevance point of view). An additional reservation is required for
    the last internal operation before an external subcontracting for
    correct MRP relevance. This reservation would not relevant for goods
    issue.

    Réponse du système

    Refurbishment order cannot be saved.

    Comment corriger cette erreur?

    Correct the reservations to fulfil the requirements above.

    Procédure pour les administrateurs système

    Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.


    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP AD_SUBCON201 - Ordre de remise à neuf avec sous-traitance non valable (voir texte desc.) ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author