Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 223
Message text: Ne pas gérer ensemble interprétation et détermination date
The function "Interpretation of points of time in the calendar" cannot
be combined with sceduling.
You can use scheduling to determine that the beginning of the period or
the end of the period are interpreted as availability dates for period
lot-sizes - as opposed to the default that the first requirement within
the period is interpreted as the availability date.
As this involves the scheduling of the availability date, this
indicator cannot be combined with the indicator for the "Time
interpretation for calendar as delivery dates".
Le système émet un message d'erreur et ne vous permettra pas de poursuivre cette transaction tant que l'erreur n'est pas résolue.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
61223
- Ne pas gérer ensemble interprétation et détermination date ?Get instant SAP help. Start your 7-day free trial now.
61222
Interprét. date, seulement possible si lot périod. selon calend. planif.
Quelle est la cause de ce problème? The function, "Time interpretation for calendar as delivery dates" is only possible in combination wi...
61221
Le rebut du sous-ensemble de l'article est de &1
Message auto-explicatif Étant donné que SAP estime que ce message d'erreur spécifique est 'auto-explicatif', aucune autre information n'a été fou...
61224
Gestion des fins de série multiniveau pas encore assistée
Quelle est la cause de ce problème? The multi-level discontinuation is not supported. This functionality will not be available until a later releas...
61225
Conversion des unités &1 <-> &2 impossible pour l'article &3
Quelle est la cause de ce problème? The system has attempted to convert the requirement quantity for material &V3& from unit of measure &am...
Cliquez sur ce lien pour rechercher tous les messages SAP.