How To Fix UPC091 - Sobrecarga servidor bloqueo p.área planificación &1, véase txt.expl.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: UPC - Planning: General Error Messages

  • Message number: 091

  • Message text: Sobrecarga servidor bloqueo p.área planificación &1, véase txt.expl.

  • Show details Hide details
  • ¿Qué causa este problema?

    If transaction data is requested in change mode, this data must be
    exclusively locked for a user. The lock server is currently processing
    other lock requests for planning area '&V1&' and can therefore not
    answer the current lock request.
    When this situaton occurs the system waits for a number of seconds and
    and then starts the lock request again. The lock server could still not
    answer the request even after this waiting time.

    Respuesta del sistema

    The requested data cannot be edited in the change mode at present.

    ¿Cómo arreglar este error?

    If this lock message occurs often then this points to a general capacity
    overload of the lock server.
    As a rule, the situation can only be avoided by making selections
    simpler. Consult note 635244 on this.
    Background Information on Locks
    The system locks the data that is described by the selection of the
    planning package. However, the following rules apply in addition for
    manual planning:
    The selection comes from the planning layout for data columns and
    individually defined rows in the planning layout.
    In the remaining cases the selection comes from the planning package.
    If variables are contained in the planning level or planning layout,
    these are replaced for the determination of the selection.
    Note that in Customizing, for variables of the type hierarchy node,
    attribute, and authorization, the replacement of variables can lead to
    many individual characteristic values:
    For hierarchy nodes the system determines all characteristic values for
    the hierarchy-defining characteristic, which are contained in the
    subtree and puts these in the selection.
    For attribute values the system reads the master data for the attribute
    and puts this in the selection.
    For authorizations, the authorization object is read and the related
    master data is read with the selection options of the authorization
    object. The master data is then transferred into the selection.
    Very complex selections can be formed in this way, which lead to a high
    load of the lock server.

    Procedimiento para Administradoras de Sistemas

    El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.


    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP UPC091 - Sobrecarga servidor bloqueo p.área planificación &1, véase txt.expl. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author