Do you have any question about this error?
Message type: E = Error
Message class: RI - Projects: commercial reporting
Message number: 109
Message text: Ninguna sociedad PA está asignada a la sociedad CO &.
The project/WBS element &V2& is assigned to controlling area &V1&.
However, controlling area &V1& is not assigned to an operating concern.
The checks could not be made.
Assign controlling area &V1& to an operating concern, or make the
checks omitting the settlement rule check.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
RI109
- Ninguna sociedad PA está asignada a la sociedad CO &. ?Get instant SAP help. Start your 7-day free trial now.
RI108
& verificado: existen inconsistencias
¿Qué causa este problema? &V1& was checked in accordance with the settings entered. Inconsistencies were found. There may also be informat...
RI107
& verificado: existen errores
¿Qué causa este problema? &V1& (and connected objects) was checked in accordance with the settings entered. Errors and inconsistencies wer...
RI110
Verificaciones finalizadas -> veáse log.
¿Qué causa este problema? The checks have been completed successfully. The result of the check is stored as a log.Respuesta del sistema El sistem...
RI111
& & &.
Mensaje autoexplicativo Dado que SAP cree que este mensaje de error específico 'se explica por sí mismo', no se ha proporcionado más información. ...
Haga clic en este enlace para buscar todos los mensajes de SAP.