Do you have any question about this error?
Message type: E = Error
Message class: QT - QM: Inspection during production (with inspection points)
Message number: 220
Message text: Se espera notificación
The material that was inspected was created using a process order. This
means that:
confirmation is expected to take place via a process message or by
calling up a function from the PI sheet.
the operation quantities that have been processed must be confirmed.
This may not be the same as the product quantity that was created,
which is recorded in the inspection point.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
RESET N1
You should check whether
a confirmation from process control is planned in the process order
the operation quantity and the inspection point quantity are different
You should then only trigger the confirmation from QM, if neither of
these possibilities apply.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
QT220
- Se espera notificación ?Get instant SAP help. Start your 7-day free trial now.
QT219
Se anula notificación
¿Qué causa este problema? You have set the indicator <LS>No confirmation</>. If you have already posted a confirmation to PP for the in...
QT218
Fije el indicador "sin notificación"
¿Qué causa este problema? You have canceled quantities that have already been confirmed, without setting the indicator for cancelling PP confirmati...
QT221
A causa del status de orden no es posible ninguna notificación a PP
¿Qué causa este problema? Due to the status of the order, confirmation to production planning is currently not possible. This is why the indicators...
QT222
Para la cabecera de orden &1 se han entrado notificaciones
¿Qué causa este problema? The indicators for partial or final confirmation cannot be changed. As a result, confirmation to production planning is n...
Haga clic en este enlace para buscar todos los mensajes de SAP.