How To Fix QST043 - El plan de fechas está incompleto


SAP Error Message - Details

  • Message type: E = Error

  • Message class: QST - Stability Study

  • Message number: 043

  • Message text: El plan de fechas está incompleto

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to complete the scheduling for a stability study using a
    follow-up function in the notification.
    This is not currently possible, as the associated testing schedule has
    not been fully maintained.

    Respuesta del sistema

    El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.

    ¿Cómo arreglar este error?

    Supplement the testing schedule for the stability study by adding a
    task list (task list group, group counter) for each item of a task list
    type. This task list is used to inspect the associated storage
    conditions.

    Procedimiento para Administradoras de Sistemas


    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP QST043 - El plan de fechas está incompleto ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant