How To Fix O1009 - & Total & > ctd.de posiciones & &. Corríjalo (¿desea reestructurarlo?)


O1009 - Overview

  • Message type: E = Error

  • Message class: O1 - IS-Oil : Message pool exchanges

  • Message number: 009

  • Message text: & Total & > ctd.de posiciones & &. Corríjalo (¿desea reestructurarlo?)

  • Show details Hide details
  • ¿Qué causa este problema?

    The sum of all the scheduling lines exceeds the item qty.

    Respuesta del sistema

    The sum of the &V1& quantity must be less than or equal to the document
    item qty. Serious error.

    ¿Cómo arreglar este error?

    Reduce the &V1& quantities in one or more schedule lines.
    Use "Restructure QS" function if possible (not yet called-off /
    delivered / received).
    If some quantities have already been called-off, you can use the
    "Allocate quantities" function to allocate the surplus quantity. This
    function reduces the &V1& quantity so that it is equal to the item
    quantity.
    You can select specific schedule lines before pressing the button
    (allocate to selected schedule lines).
    An option also exists, in which single schedule lines (allocation by
    date entered) do not have to be selected.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


O1009 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker