Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 276
Message text: &: Costes a pesar de actividad 0
Plan activity and posted activity for &V1& are both 0. Nevertheless,
costs were planned or posted.
The price for &V1& cannot be calculated as it would involve division by
zero. The costs can therefore not be included in the price calculation.
For plan price calculation, check planning of &V1& and its cost
planning for period(s) &V3&.
For actual price calculation, check postings made to &V1& in period(s)
&V3&.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KP276
- &: Costes a pesar de actividad 0 ?Get instant SAP help. Sign up for our Free Essentials Plan.
KP275
&: tarifa política fluctúa
¿Qué causa este problema? You set a manual activity price in &V1&. Simultaneously, an annual price is calculated for version &V3&, ...
KP274
&: actividad = 0
¿Qué causa este problema? Planning of activity quantities for &V1& in period(s) &V3& is not reconciled. Plan activity for &V1&a...
KP277
&: referencia de actividades en actividad 0
Plan activity for &V1& is 0. Nevertheless, activity input was planned for &V2&.Respuesta del sistema The activity price for this act...
KP278
Relación de actividades detallada en la iteración parcial.
¿Qué causa este problema? In the iterative price calculation framework, the system detected an assignment between &V1& and &V2&. Ho...
Haga clic en este enlace para buscar todos los mensajes de SAP.