Do you have any question about this error?
Message type: E = Error
Message class: KE -
Message number: 716
Message text: Niv. de integración todavía no soportados para la aplic. &1 &2 &3.
It is not possible to activate summarization levels for the function
&V1& &V2& &V3&.
You tried to maintain summarization levels for account-based
Profitability Analysis.
At this time, summarization levels are only supported for costing-based
Profitability Analysis.
The summarization levels were not activated.
If you want to set up summarization levels for costing-based
Profitability Analysis, switch the type of Profitability Analysis.
This function is found under "Environment -> Set operating concern" in
the application menu, or in Customizing under "Basic settings ->
Set operating concern".
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
KE716
- Niv. de integración todavía no soportados para la aplic. &1 &2 &3. ?Get instant SAP help. Start your 7-day free trial now.
KE715
La activación de los niveles de integración se ha cancelado.
¿Qué causa este problema? The field list of summarization level &V1& contains invalid field names (&V2&). This error can occur foll...
KE714
La activación de los niveles de integración se ha cancelado.
¿Qué causa este problema? The system creates separate tables in the ABAP/4 Dictionary and in the database for each summarization level. All names b...
KE717
La activación de los niveles de integración se ha cancelado.
¿Qué causa este problema? An error occurred while Table &V2& for summarization level &V1& was being saved in the ABAP/4 Data Dictio...
KE718
Falta la autorización para actualizar los niveles de integración.
¿Qué causa este problema? You want to write data to the summarization levels. However, you do not have authorization to actualize/create the summar...
Haga clic en este enlace para buscar todos los mensajes de SAP.