Message type: E = Error
Message class: GPD - Pegging & Distribution
Message number: 072
Message text: Distrib.costes p.elemento PEP PlNec & ya se ha ejecutado en período &2 &3
Cost distribution for grouping WBS element &V1& has already taken place
for period &V2&, year &V3&. You cannot perform cost distribution for an
earlier period.
Grouping WBS element &V1& is excluded from processing, as are all
production orders and purchase orders belonging to that element.
Reperform cost distribution for period &V2&. All costs incurred in the
meantime will be posted to this period.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
GPD072
- Distrib.costes p.elemento PEP PlNec & ya se ha ejecutado en período &2 &3 ?Get instant SAP help. Start your 7-day free trial now.
GPD071
Trate conjuntamente todos los elementos PEC de PlNec dependientes
¿Qué causa este problema? Grouping WBS element &V1& is not contained in the selection. This is a requirement because of hierarchical depend...
GPD070
No se ha podido asignar el plan de cobertura de necesidad &1
¿Qué causa este problema? Object &V1& could not be assigned. The assignments to the next higher assembly material &V2&, object &...
GPD073
Imposible anular elemento PEP planif.necesidades distribución costes &1
¿Qué causa este problema? Problems occured when cancelling the cost distribution for grouping WBS element &V1&: The selected period does no...
GPD074
El status no permite distribución de costes: &1
¿Qué causa este problema? The object status does not permit cost postings. Examples of such statuses are 'opened' and 'completed...