Do you have any question about this error?
Message type: E = Error
Message class: GPD - Pegging & Distribution
Message number: 070
Message text: No se ha podido asignar el plan de cobertura de necesidad &1
Object &V1& could not be assigned. The assignments to the next higher
assembly material &V2&, object &V3& could not be found.
This could be caused by a program error or a process that is not
supported.
Processing continues.
In transaction <ZH>PEG05</>, check whether all objects are assigned
correctly. Because of this error, objects are partly assigned to the
WBS element for excess on plant level.
Inform the person responsible for the process of this problem or
contact SAP.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
GPD070
- No se ha podido asignar el plan de cobertura de necesidad &1 ?Get instant SAP help. Start your 7-day free trial now.
GPD069
Verifique los períodos introducidos
¿Qué causa este problema? Similar to settlement, distribution of costs and payments is a typical period-end function. Usually, it is performed at t...
GPD068
Definir elemento PEP para exceso, rechazo y diferencias de stock
¿Qué causa este problema? You have not defined a WBS element for excess, scrap, and stock differences.Respuesta del sistema Processing stops.¿Có...
GPD071
Trate conjuntamente todos los elementos PEC de PlNec dependientes
¿Qué causa este problema? Grouping WBS element &V1& is not contained in the selection. This is a requirement because of hierarchical depend...
GPD072
Distrib.costes p.elemento PEP PlNec & ya se ha ejecutado en período &2 &3
¿Qué causa este problema? Cost distribution for grouping WBS element &V1& has already taken place for period &V2&, year &V3&...
Haga clic en este enlace para buscar todos los mensajes de SAP.