Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 722
Message text: Orden & op.& se encuentra fuera de holgura tiempo de anticipo + holg. op.
An operation is to be dispatched so that it lies outside the float
before production and the operation float. However in the strategy
profile in Customizing for capacity planning the indicator <ZH>Use
float bef. prod.</> is set. This is used to specify that the planning
result only counts as free from error if the operation lies within the
operation float and the float before production.
Reschedule the operation if necessary or
reschedule another commitment so as to increase available capacity.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
CY722
- Orden & op.& se encuentra fuera de holgura tiempo de anticipo + holg. op. ?Get instant SAP help. Start your 7-day free trial now.
CY721
La orden & operación & se encuentra fuera de la holgura de la operación
¿Qué causa este problema? An operation is to be dispatched so that it lies outside the operation float. However, in the strategy profile in Customi...
CY720
Orden & operación &: conflicto de solapamiento con op. sucesora &
¿Qué causa este problema? An operation is to be dispatched in such a way that it overlaps with thefollowing one. However no overlapping has been pl...
CY723
Orden & operación & se encuentra fuera de holgura tiempo de seguridad
¿Qué causa este problema? An operation is to be dispatched so that it lies outside the float after production. However, in the strategy profile in ...
CY724
Orden & operación empieza en el pasado
¿Qué causa este problema? The system is to dispatch an operation. The indicator <ZH>Indicator forwards</> is not set in the strategy pr...
Haga clic en este enlace para buscar todos los mensajes de SAP.