How To Fix CY450 - Orden previsional &1 operación &2 se ha borrado durante reprogramación


CY450 - Overview

  • Message type: E = Error

  • Message class: CY - Capacity Requirements Planning

  • Message number: 450

  • Message text: Orden previsional &1 operación &2 se ha borrado durante reprogramación

  • Show details Hide details
  • ¿Qué causa este problema?

    If you dispatch, reschedule or deallocate a planned order the system
    reschedules it. It reads in the new routing to do this.
    One of the following problems has probably arisen while the routing was
    being read in or during scheduling:
    The planned order was now scheduled using different scheduling
    parameters.
    No valid routing was found.
    The operation does not exist in the valid routing.

    Respuesta del sistema

    The original operation and the capacity requirements belonging to it
    were deleted.

    ¿Cómo arreglar este error?

    Check the scheduling parameters and the routing.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


CY450 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author