How To Fix CPBR209 - No existe ninguna asignación válida de material a hoja de ruta


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CPBR - Error/Warning/Information Messages for Browser

  • Message number: 209

  • Message text: No existe ninguna asignación válida de material a hoja de ruta

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to assign an item to an operation. However, there is no
    assignment from the routing for the operation to the BOM material in
    the item. If the item is found in a phantom assembly there is no
    assignment from the routing to the material, into which the phantom
    assembly is inserted.

    Respuesta del sistema

    The system does not create the component assignment.

    ¿Cómo arreglar este error?

    Assign the BOM material in the item to the routing for the operation.
    If the item is found in a phantom assembly, assign the material, into
    which the phantom assembly is inserted, to the routing.
    Create the component assignment.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CPBR209 - No existe ninguna asignación válida de material a hoja de ruta ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker