How To Fix CN747 - Transferida duración máxima de &1 días para la operación &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 747

  • Message text: Transferida duración máxima de &1 días para la operación &2

  • Show details Hide details
  • ¿Qué causa este problema?

    You want to adjust the duration of a network activity to the maximum
    delivery time or replenishment lead time of all allocated material
    components.

    Respuesta del sistema

    The system only calculates using the allocated material components that
    have the indicator <ZH>Alignment finish date</> set. The maximum
    duration comes from
    the planned delivery time when the material components are procured
    externally
    the total replenishment lead time when the material components are
    produced internally or the in-house production time if the total
    replenishment lead time is not maintained in the material master

    ¿Cómo arreglar este error?

    Make sure that the <ZH>Alignment finish date</> indicator on the
    component detail screen of the activity is set for all material
    components allocated to the activity.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CN747 - Transferida duración máxima de &1 días para la operación &2 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author