Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CN268 - No existen necesidades primarias planificadas de &1 para &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 268

  • Message text: No existen necesidades primarias planificadas de &1 para &2

  • Show details Hide details
  • ¿Qué causa este problema?

    You have changed the requirements date for a planned independent
    requirement for material &v1&.

    Respuesta del sistema

    The system cannot determine any planned independent requirements for
    the original requirements date &V2&. Therefore it cannot consume the
    requirements for the old date.
    Due to the change, the system has created planned independent
    requirements for the new date, so that there is a risk that the
    requirements may exist twice.

    ¿Cómo arreglar este error?

    Check the current stock/requirements situation for material &v1&.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CN268 - No existen necesidades primarias planificadas de &1 para &2 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author