How To Fix CN268 - No existen necesidades primarias planificadas de &1 para &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 268

  • Message text: No existen necesidades primarias planificadas de &1 para &2

  • Show details Hide details
  • ¿Qué causa este problema?

    You have changed the requirements date for a planned independent
    requirement for material &v1&.

    Respuesta del sistema

    The system cannot determine any planned independent requirements for
    the original requirements date &V2&. Therefore it cannot consume the
    requirements for the old date.
    Due to the change, the system has created planned independent
    requirements for the new date, so that there is a risk that the
    requirements may exist twice.

    ¿Cómo arreglar este error?

    Check the current stock/requirements situation for material &v1&.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CN268 - No existen necesidades primarias planificadas de &1 para &2 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author