Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CK521 - Dividir por cero en la fórmula &4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 521

  • Message text: Dividir por cero en la fórmula &4

  • Show details Hide details
  • ¿Qué causa este problema?

    Work center &V3& is assigned to routing/operation &V1& in plant &V2&
    with formula &V4&.
    The system calculates the amount of activity anticipated for each
    activity type on the basis of the formula in the work center and the
    default value in the operation. This activity is valuated with the
    prices in Cost Center Accounting in order to determine the planned
    costs for the operation.
    While calculating the activity quantity, formula &V4& attempted to
    divide by zero.

    Respuesta del sistema

    The system cannot calculate the planned costs for operation &V1&.

    ¿Cómo arreglar este error?

    Check the master data for work center &V3&. Specify a valid formula
    when assigning the work center to a cost center.
    Select a formula that does not result in division by zero.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CK521 - Dividir por cero en la fórmula &4 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker