How To Fix CK318 - Cálculo del coste para material & es incorrecto -> precio plan


CK318 - Overview

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 318

  • Message text: Cálculo del coste para material & es incorrecto -> precio plan

  • Show details Hide details
  • ¿Qué causa este problema?

    When an assembly was valuated, the system found that the cost component
    split of material component &V1& from plant &V2& contains errors.

    Respuesta del sistema

    The cost component split with errors is not changed. Instead,
    valuation is carried out with a price from the material master. This
    result goes into the cost rollup. This happens so that the costing
    result of the finished product is still meaningful.
    <ZH>Note</> The subsequent valuation is always with valuation variant
    &V3&. Valuations with a manual cost component split are not taken
    into account. This affects the following two cases:
    strategy '8': valuation with manual cost component split
    the possibility to calcualte manual cost component splits in addition
    to the valuation strategy entered.

    ¿Cómo arreglar este error?

    Analyze the cost component split with errors and solve them.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP CK318 - Cálculo del coste para material & es incorrecto -> precio plan ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant